Software Campaign managed resources
In TS-0001 a procedure is described for when a campaign that is enabled has one of the managed specializations is deleted (such as the case for expiration).
What is missing is the behavior when a managed specialization is deleted when the campaign is not enabled. Should the individual instance be removed?