|Supporting Members or Partner type 2 |Exacta, Deutsche Telekom, C-DOT, Hansung University |
|Date: |2023-07-03 |
|Abstract: |This WI defines conformance test for oneM2M. |
|Template Version:23 February 2015 (Do not modify) |Template Version:23 February 2015 (Do not modify) |
> **oneM2M Copyright statement**
> No part may be reproduced except as authorized by written permission.
> The copyright and the foregoing restriction extend to reproduction in all media.
> All rights reserved.
# 1 Title (Acronym)
Conformance Test Maintenance
# 2 Justification
Conformance test is needed to test if the implementation complies with the defined oneM2M specifications. The proposed WI is to maintain the specifications for conformance test from different releases.
# 3 Intended Output
**Tick all the appropriate cases**
| Check | Case |
|-|-|
|√ |Change request(s) to existing Technical Specification(s) |
| |Change request(s) to existing Technical Reports(s) |
| |New Normative Technical Specifications(s) |
| |New Permanent Technical Reports(s) |
| |New Temporary Technical Reports(s) |
# 4 Impact
None
# 5 Scope
The scope of the WI includes verification, correction and completion of the following specifications:
TS-0017 - Implementation Conformance Statements
- Check list for the ICS.
TS-0018 - Test Suite Structure and Test Purposes
- Organize the functions and features need to be tested into test suites.
- Specify test purposes and test descriptions for conformance test.
- Define test cases.
TS-0019- Abstract Test Suite and Implementation eXtra Information for Test
- Definition of the Abstract Protocol Tester (APT)
- Definition of TTCN-3 test architecture
- Development of TTCN-3 test suite, e.g. naming conventions, code documentation, test case structure.
- IXIT proforma;
# 6 Schedule and impacted specifications
## 6.1 New Specifications (if any)
Provide the schedule of tasks to be performed;
| Document<br/>Type | Document<br/>Number\* | Title | Schedule (TP No.)<br/>Start | Schedule (TP No.)<br/>Change Control | Schedule (TP No.)<br/>Freeze | Schedule (TP No.)<br/>Approval | Lead WG | Impacted WGs | Comments |
|TS |0018 |Test Suite Structure and Test Purposes |TP53 |TP55 |TP56 |TP62 |WG3 |None |Rapporteur:<br/>Siddharth Trikha |
|TS |0019 |Abstract Test Suite and Implementation eXtra Information for Test |TP53 |TP55 |TP56 |TP62 |WG3 |None |Rapporteur:<br/>Miguel Angel Reina Ortega |
# 7 Work Item Rapporteur(s)
Siddharth Trikha (C-DOT), Miguel Angel REINA ORTEGA (ETSI)
# 8 History
**Document history**
|Version |Date |Description |
|-|-|-|
|V0.0.1 |29 November 2021 |Initial proposal |
|V0.0.1 |2021-12-06 |Uploaded to the WPM area of the portal following agreement of TP-2021-0125 |
|V0.0.2 |2023-06-30 |Update: rapporteur replacement and extension for the WI lifetime |
|V0.0.2 |2023-07-03 |Uploaded to the WPM area of the portal following agreement of TP-2023-0062 |